🏁After the measurements

Things to do when you finished with one sample or shift is over

  1. Switch off analyzer electronics and close the beamline valves (starting from Beamshutter). For a short break (e.g. while changing samples) it is enough to close experimental valve and beamshutter;

  2. Close valve between the chambers;

  3. Close the needle valve of liquid helium transfer line;

  4. Open the valve on the helium dewar to helium recovery line (or connect it);

  5. Stop helium pump ("FP Helium" button on the panel at the back side of 1^2 frame);

If you are leaving:

  1. Remove all the unnecessary marks on the screens;

  2. Remove sample names from the magnets on the wall;

  3. Remove files from desktop to your User folder;

  4. Don't forget your samples and return sample plates if possible.

Last updated

Was this helpful?